Motorists are being warned of a series of road closures planned for Peterborough, which will last until the end of March.
The closures are to allow road surfacing to take place, and will see some main, busy roads impacted – as well as small side streets.

5. Roadworks in Peterborough
Davids Lane as lies between Werrington Parkway and Davids Close will be closed from March 11 until March 13 between 9.30am and 3.30pm Photo: Google

6. Roadworks in Peterborough
Rightwell East will be closed between 8pm and 6am from March 19 to March 25 Photo: Google

7. Roadworks in Peterborough
Rightwell West will be closed from between 8pm and 6am from March 19 until March 25 Photo: Google

8. Roadworks in Peterborough
Artindale will be closed between 8am and 5pm from March 17 until March 19 Photo: Google
2 / 8

