Latest Peterborough road closures announced

The latest set of roadworks in Peterborough have been announced.

The following works are due to take place:

. Wentworth Street, between Bridge Street and Wentworth Street, to allow for the installation of a tower crane. Closure dates will be confirmed locally on site, but it is anticipated that the works will take place between Monday, August 31 and Monday, October 5.

. Glinton Road, Helpston - a closure in place between 9.30am and 3.30pm from Tuesday, September 1 until Wednesday, September 16 for road surfacing.

Roadworksplaceholder image
Roadworks

. Whitwell, Paston - a closure in place between 9.30am and 3.30pm from Tuesday, September 1 until Wednesday, September 16 for road surfacing.

. Hankey Street, Millfield - a closure in place between 9.30am and 3.30pm from Tuesday, September 1 until Wednesday, September 16 for road surfacing.

. Bamber Street, Millfield - a closure in place between 9.30am and 3.30pm from Tuesday, September 1 until Wednesday, September 16 for road surfacing.

. Eastfield Road, Eastfield - a closure in place between 9.30am and 3.30pm from Tuesday, September 1 until Wednesday, September 16 for road surfacing.

. Dickens Street, Eastfield - a closure in place between 9.30am and 3.30pm from Tuesday, September 1 until Wednesday, September 16 for road surfacing.

. Bridgehill Road, Newborough, between Gunton Road and Drain Road for poling works. Closure dates will be confirmed locally on site, but it is anticipated that the works will take place on Friday, August 28.

. Maxey Road, Helpston, between points 10 metres either side of the level crossing for maintenance works. It is expected that the works will take place between 11pm on Sunday, August 30 and 6am the following morning.

Related topics:
News you can trust since 1948
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice