Great Eastern Run: All you need to know about weekend road closures for Peterborough half marathon

The AEPG Great Eastern Run will take place on Sunday, October 15

The annual half marathon – and the Anna’s Hope 5km Fun Run – will both take place tomorrow (Sunday, October 15.)

To make sure the event goes off safely, a number of road closures will be in place across Peterborough throughout the day.

The closures are:

Great Eastern Run 2022.  The main race starts.placeholder image
Great Eastern Run 2022. The main race starts.

A15 Bourges Bvd Southbound Between Rivergate R/B and Queensgate R/B: Closure: 5am. Enforced Closure: 8:30am. Expected opening by 11:00am

A47 off clips Jct 19 Junction 19 A47: Closure: 7am. Enforced Closure: 7am. Expected opening by 1:30pm

Amberley Slope Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Arundel Road Between Mounttseven Ave and Corfe Ave: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

The run takes place on October 15placeholder image
The run takes place on October 15

Bishops Road Between Rivergate R/B and South Street: Closure: 5am. Enforced Closure: 5am. Expected opening by 3:30pm

Broadway Between Long Causeway and Park Crescent: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 11:30am

Cathedral Grounds Wheel Yard to Gravel Walk: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Central Park Parks Department: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2:00pm

Chapel Street Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Church Street Between Cowgate and Bridge Street. Closure: 7am. Enforced Closure: 8:30am. Expected opening by 11:30am

Church Street Werrington Between Amberley Slope and Lincoln Road. Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

City Road Broadway to Northminster. Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Corfe Ave Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Cowgate Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 11am

Croyland Road Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Davids Lane Between Lincoln Road and Goodwin Walk: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Dogsthorpe Road Between Park Road and Lawn Avenue: Closure: 7am. Enforced Closure: 10am. Expected opening by 2pm

Eastfield Lane Between Princes Gdns and Boongate: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Fulbridge Road Between Goodwin Walk and Hallfields Road: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Goodwin Walk Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Gravel Walk Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Halfields Lane Between Paston Ridings and Holland Avenue: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Holland Ave Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Lawn Ave Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Lincoln Road Between Church Street and Davids Way: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Long Causeway Between Church Street and Broadway: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 11:30am

Mountsteven Ave Between Croyland Road and Arundel Road: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

New Road Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Northminster New Road to City Road : Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Park Crescent Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 2pm

Park Road Between Park Crescent and Dogthorpe Road: Closure: 7am. Enforced Closure: 10am. Expected opening by 2pm

Paston Ridings Between Topmoor Way and Hallfields Lane: Closure: 7am. Enforced Closure: 10am. Expected opening by 12:30pm

Princes Gate Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

Princes Gardens Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

St Johns Street Entire Length: Closure: 7am. Enforced Closure: 8:30am. Expected opening by 2pm

St Pauls Road Between Lawn Ave and Fulbridge Road: Closure: 7am. Enforced Closure: 10am. Expected opening by 1:30pm

Topmoor Way Entire Length: Closure: 7am. Enforced Closure: 10am. Expected opening by 1:30pm

For more information, visit www.greateasternrun.co.uk.

Related topics:
News you can trust since 1948
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice