Roadworks in and around Peterborough - the starting date, end date, location description and comments.
02/07/07 to 30/04/08
Nene Parkway southbound carriageway between junction 31 Morley Way and Junction 3 Fletton Parkway
Carriageway widening
Off peak 09:30hrs to 15:30hrs single lane closure southbound
22/07/07 to 30/04/08
Fletton Parkway junction 2-3
Carriageway widening
Lane 2 closure east & westbound utilising hard shoulder to maintain 2 lanes in each direction. Periodic off peak restrictions to one running lane to provide additional working space. Short term overnight closure to allow footbridge construction.
06/11/07 to Spring 08
'on' slip road from junction 2 Goldhay Way/Malborne Way roundabout onto eastbound carriageway of Fletton Parkway
'on' slip closure
Slip road closure for major reconstruction associated with the widening of Fletton Parkway. A local diversion will be signed via the westbound carriageway of Fletton Parkway to Junction 1 Orton Parkway roundabout and back onto the eastbound carriageway of Fletton Parkway.
Sept 07 to 05/05/08
Paston Parkway junction 21Gunthorpe Road to junction 22 Fulbridge Road
Carriageway Widening
A new dual carriageway is to be constructed between j22 & j21. When open the existing & proposed roads will form a dual carriageway. Associated works such as the installation of safety fencing , lighting, signing, road markings & an environmental barrier will also be completed. Some short term closures will be required to be advertised on site
Road closed overnight from 20.00 till 06.00 4,6,11,13,18-12-07
05/11/07 to 12/10/08
A1 Carpenters Lodge roundabout, Stamford
Major Junction Works
Narrow lanes with40 MPH speed limit limited over night closures
07/01/08 to 07/07/08
A1 Carpenters Lodge Roundabout
Road Work / Junction improvements
50 MPH speed limit on Northbound & Southbound carriageways from a point approximately 1600 metres north & south of the roundabout
07/01/08 to 07/07/08
A1 southbound from a point 600 metres south of A43 underbridge at Wothorpe to the A47 at Wansford. Northbound from a point 600 metres north of the A47 at Wansford to A43 at Wothorpe
Road Work / Junction improvements
Road closed with a signed diversion route
07/01/08 to 07/07/08
A1 junction of Racecourse Road & B1081 Old Great North Road
Road Work / Junction improvements
No access or exit from A1 at junction of Racecourse Road & B1081 Old Great North Road
28/01/08 to 25/04/08
Fengate junction of Boongate
Section 278 works junction signallisation & reconstruction
Temp traffic lights
05/05/08 to 20/05/08
A1 from Carpenters Lodge to A47 southbound
Carriageway resurfacing
Road Closed over night with traffic diverted via A6121, A47
12/05/08 to 02/06/08
A1M junction 17 southbound off slip
Reconstruction works
Slip road closure with traffic diverted via A605, Oundle Road, A1139 Orton Parkway, A1139 Fletton Parkway
02/06/08 to 21/06/08
A1M Junction 17 northbound on slip
Reconstruction works
Slip Road closure with traffic diverted via A1139 Fletton Parkway, A1139 Orton Parkway, A605 Oundle Road
June 08 to Sept 08
Fletton Parkway A1139 Junction 1
Junction Improvement works / new access to development
Lane closure Monday to Thursday 21.30-05.30 Friday 22.00-08.00 Saturday 20.00-10.00 Sunday 22.00-05.30
The full article contains 556 words and appears in n/a newspaper.
-